Archives for December 2007

Mekoryuk

Following a met tower wind study in Mekoryuk from 2005 to 2007 and subsequent feasibility analysis by GEC, two Northern Power Systems Northwind 100 A model wind turbines at 32 meter hub heights were installed in 2010, though not placed into operational status until 2011 following completion of a new automated power-generation control module. Between […]